home tester
TESTER
TESTER - INTRO
TESTER FAQS
WHAT IS TESTER?
TESTER SCHEME
scheme 1
scheme 2
scheme 3
scheme 4
VISUAL SCHEME
TESTER ·TESTER SCHEME 1
This time we are starting to read from the second chapter, the lift works from the second floor upwards, time cannot be set to zero…
Because we are starting from the experience already obtained from "Art and electricity".
Through the way of operating of the Foundation "Fundación Rodríguez", we can count on Arteleku's basic support, and this means that our starting point is a study that has already been carried out, and we can also count on "assets" such as the "A&E" project, which is still in operation.....

Within this circle that represents the "known limits" (or limits experienced), we would like to include the production resources, the support and energy mechanisms.
These resources are the circles which form an intersection, they are the contributions of the collaborating entities (the Basque Government, Artium..), that will have the capacity to start up the project through the Rodríguez mechanism, a circuit that encircles them in order to make the project possible.

These elements (each one of a different colour) turn at a high speed giving rise to the white light that will move the system.


[Arteleku] [Rodriguez Fundazioa] [Eusko Jaularitza] [American Foundation Center] [Casa Asia]