|
|
The "new electric
activity" (2003-2004), is the project's production
phase; this activity is the very consequence of the system.
In this phase, the mechanisms for generating energy at
the system's limits, in the layers furthest away from
the centre (always with reference to the graph), are at
maximum productivity.
On occasions the activity escapes and is transmitted to
other networks and to other systems, but this is understood
to be productive and necessary for the Rodríguez
circuit, which considers as a success the expansion of
electricity, the expansion of this network
The work with the "TESTER nodes" is now closer
and more necessary than ever since the optimisation of
the white light, the available energy comes into play.
|
|