|
|
There is a "spring
back" effect at a certain moment in this phase.
The circulation changes direction and the outer points
of the scheme become transmitters of electricity.
The activity generated returns at a given moment to the
commission or meeting of the "TESTER nodes"
who, together with Rodríguez, shall give a visible
shape to the results through a strategy that shall limit
itself to considerations for the project's diffusion.
This is when the new mechanism prepared in the commission
shall be put into operation, and this should comply with
the different stages agreed upon. (2004
).
At this time the project
shall have multiple electric ramifications and the network
this system is based on shall have new extensions and
new nodes. |
|